Building Control Act 1989 · 2020 Revised Edition · Part 3B · Environmental Sustainability Measures for Existing Buildings
22FT. Maintenance period
Last amended by an amending law of 2024.
Official textFrom Singapore Statutes Online, unchanged
This section applies after the measures set out in the energy efficiency improvement plan are carried out in relation to a Type 1 building under section 22FQ.
energy efficiency improvement plan
“energy efficiency improvement plan” means an energy efficiency improvement plan prepared under section 22FN(1)(c), and includes any energy efficiency improvement plan amended in accordance with section 22FO(4) or 22FS(1);
The owner of the building must —
building
“building” means any permanent or temporary building or structure and includes —(a)a hut, shed or roofed enclosure;(b)an earth retaining or stabilising structure, whether permanent or temporary;(c)a dock, wharf or jetty;(ca)a floating structure, not being a boat or vessel, constructed or to be constructed on a flotation system that —(i)is or is to be supported by water;(ii)is not intended for or useable in navigation; and(iii)is or is to be permanently moored;(d)a culvert, crossing, bridge, underpass or tunnel;(da)a fixed installation;(e)a sewage treatment plant, sewer, drain, swimming pool or any non‑proprietary type of concrete tank for the storage of any solid, liquid or gaseous product;(f)a shelter provided under the Civil Defence Shelter Act 1997; and(g)such other erection or structure (whether permanent or temporary) as the Minister may, by order in the Gazette, declare to be a building;
maintain the specified reduction or approved reduction in energy use intensity in relation to the building for a prescribed maintenance period; and
submit a maintenance report to the Commissioner of Building Control within 3 months after the last day of the maintenance period or any longer period that the Commissioner of Building Control may allow in writing.
The maintenance report mentioned in subsection (2)(b) must —
state the energy use intensity of the building during the maintenance period;
if the specified reduction or approved reduction in energy use intensity is not maintained during the maintenance period — contain additional measures to supplement the energy efficiency improvement plan;
be prepared and signed by a specified individual; and
be submitted in the form and manner specified by the Commissioner of Building Control.
An owner of a Type 1 building who, without reasonable excuse, contravenes subsection (2)(b) shall be guilty of an offence and shall be liable on conviction to a fine not exceeding $150,000 and, in the case of a continuing offence, to a further fine not exceeding $1,000 for every day or part of a day during which the offence continues after conviction.
Type 1 building
“Type 1 building” means an existing building, or part of an existing building, of any class or type for the time being prescribed for the purposes of Divisions 2, 3 and 4;
Terms defined in this Act
approved reduction
Defined · s 22FA“approved reduction”, in relation to the energy use intensity of a building, means a reduction in the energy use intensity of the building by a percentage approved by the Commissioner of Building Control under section 22FO(3) for that building;
building
Defined · s 2“building” means any permanent or temporary building or structure and includes —(a)a hut, shed or roofed enclosure;(b)an earth retaining or stabilising structure, whether permanent or temporary;(c)a dock, wharf or jetty;(ca)a floating structure, not being a boat or vessel, constructed or to be constructed on a flotation system that —(i)is or is to be supported by water;(ii)is not intended for or useable in navigation; and(iii)is or is to be permanently moored;(d)a culvert, crossing, bridge, underpass or tunnel;(da)a fixed installation;(e)a sewage treatment plant, sewer, drain, swimming pool or any non‑proprietary type of concrete tank for the storage of any solid, liquid or gaseous product;(f)a shelter provided under the Civil Defence Shelter Act 1997; and(g)such other erection or structure (whether permanent or temporary) as the Minister may, by order in the Gazette, declare to be a building;
Commissioner of Building Control
Defined · s 2“Commissioner of Building Control”, in relation to this Act or any Part or provision of this Act, means any Commissioner of Building Control appointed under section 3(1) to be responsible for the operation of this Act or that Part or provision, as the case may be;
energy efficiency improvement plan
Defined · s 22FA“energy efficiency improvement plan” means an energy efficiency improvement plan prepared under section 22FN(1)(c), and includes any energy efficiency improvement plan amended in accordance with section 22FO(4) or 22FS(1);
energy use intensity
Defined · s 22FA“energy use intensity”, in relation to a building, means the annual energy consumption of the building per unit of gross floor area (expressed in kilowatt hour (kWh) per square metre per year), calculated using the prescribed methodology;
prescribed
Defined · s 29A“prescribed” means prescribed in the regulations made under section 29L.
specified reduction
Defined · s 22FA“specified reduction”, in relation to the energy use intensity of a building, means a reduction in the energy use intensity of the building by a prescribed percentage;
Type 1 building
Defined · s 22FA“Type 1 building” means an existing building, or part of an existing building, of any class or type for the time being prescribed for the purposes of Divisions 2, 3 and 4;
Spot a mistake in this text? Suggest a correction.
Part 4
Dangerous Buildings and Occurrences
Part 4A
Maintenance of Buildings
Part 5
Inspection of Buildings and Building Façades
Part 5A
Licensing of Builders
Part 5B
Regulating Fixed Installation Contractors
Part 6