Skip to content
In forceAmended2020 Revised Edition
Contents

Part 3B · Environmental Sustainability Measures for Existing Buildings

22FR. Progress report on energy efficiency improvement plan

Amended

Last amended by an amending law of 2024.

(1)

Without affecting section 22FQ(1), the Commissioner of Building Control may issue a written direction to the owner of a Type 1 building to submit a progress report.

(2)

The progress report must —

(a)

set out the measures in the energy efficiency improvement plan that have been carried out in relation to the building; and

(b)

be in the form and manner specified by the Commissioner of Building Control.

(3)

An owner of a Type 1 building who, without reasonable excuse, fails to comply with a written direction mentioned in subsection (1) shall be guilty of an offence and shall be liable on conviction to a fine not exceeding $10,000.

Part 4

Dangerous Buildings and Occurrences

Part 4A

Maintenance of Buildings

Part 5

Inspection of Buildings and Building Façades

Part 5A

Licensing of Builders

Part 5B

Regulating Fixed Installation Contractors

Part 6

Miscellaneous