Regulation 5

of Civil Aviation Authority of Singapore (Airport Master Plan) Rules 2009

Regulation 5

Periodic review of final master plan

Amended byS 109/2020 wef 15/02/2020

Subregulation 1

If a final master plan (referred to in this rule as the original plan) for an airport is in force, the airport licensee for the airport must —

(a)

at least once during the first regulatory period applicable to the airport licensee; and

(b)

at least once during every subsequent regulatory period applicable to the airport licensee,submit to the Authority, in writing, a draft master plan that is expressed to replace the original plan.

Subregulation 2

Amended byS 109/2020 wef 15/02/2020

Any draft master plan under paragraph (1) must be submitted at least 9 months before the start of the next regulatory period.

Subregulation 3

When the draft master plan referred to in paragraph (1) becomes a final master plan for the airport, the original plan ceases to be in force.